Planned maintenance, recorded against an aircraft and a period, so planners can
see it on the same timeline as the flying.
Where: MX → SCHEDULED MAINTENANCE
Columns: Title (with (AOG) appended when the aircraft is on ground),
Time Period Start / End, Aircraft Reg, CAM limits (TAH / TAC /
Date), Files, Notes, Status, Work order, Action. A
UTC / THR switch controls the times shown.
Name (required), Status (Open / Completed), Aircraft (required),
Airport (required), work order, supplier and facility, the checkboxes
Aircraft On Ground and Confirmed, the Time Period, CAM limits
(TAH / TAC / Date), maintenance cost with currency, tags, notes and files.
| Symptom | Cause | Fix |
|---|---|---|
| A server error on save with no field highlighted | Time Period is empty | Fill in start and end |
| The TAC column repeats the TAH value | TAC is not displayed correctly | Read TAC from the record itself |
| Times unchanged after switching UTC/THR in an open dialog | Already-loaded values are not re-converted | Close and reopen the dialog |
| A flight was planned during maintenance | Maintenance does not block scheduling | Check maintenance before planning |